13 Mar, EOD - Indian

Nifty Smallcap 100 15895.25 (-2.51)

SENSEX 74563.92 (-1.93)

Nifty Midcap 100 54761.1 (-2.65)

Nifty Next 50 64691.45 (-2.61)

Nifty IT 29071.25 (-1.72)

Nifty Pharma 22832.2 (-1.90)

Nifty 50 23151.1 (-2.06)

Nifty Bank 53757.85 (-2.44)

13 Mar, EOD - Global

NIKKEI 225 53819.61 (-1.16)

HANG SENG 25465.6 (-0.98)

S&P 6648 (-0.62)


Hot Pursuit News

You are Here : Home > News > Hot Pursuit News >

(18 Dec 2025, 11:55)

Patel Engineering surges after signing MoU to revive 144 MW Gongri Hydropower project

Patel Engineering surged 5.51% to Rs 30.65 after it has signed a memorandum of understanding (MoU) with the Government of Arunachal Pradesh for the restoration and development of the 144 MW Gongri Hydropower Project in West Kameng District.


The Gongri Hydroelectric Project, located near Dirang town on the Gongri river, a tributary of the Bichom river in the Kameng basin, had been previously terminated but was revived under the “Arunachal Pradesh Restoration of Terminated Large Hydropower Policy under Special Circumstances, 2025.” It is the first project reinstated under this framework.

The total project cost was estimated at Rs 1,700 crore, with a planned completion timeline of four years. The revival aligned with Arunachal Pradesh’s “Decade of Hydropower” initiative, aimed at positioning hydropower as a key contributor to the state economy while promoting employment, infrastructure development, and sustainable growth.

Under the MoU, Patel Engineering undertook the project’s entire lifecycle, including preparation and validation of the Detailed Project Report (DPR), design and engineering of the hydroelectric system, procurement of electro-mechanical equipment, construction of the dam and powerhouse, installation and commissioning of turbines and generators, and development of transmission infrastructure. The company also committed to overseeing operations and maintenance post-commissioning.

The project was to be implemented on a BOOT (Build-Own-Operate-Transfer) basis for a 40-year lease period, after which ownership and operational control would revert to the Government of Arunachal Pradesh.

Patel Engineering operates in the hydropower, tunneling and irrigation segments. The company has executed projects in India and overseas, including more than 85 dams, 40 hydroelectric projects and over 300 km of tunneling for central PSUs and state government agencies.

On a consolidated basis, net profit of Patel Engineering declined 2.72% to Rs 71.05 crore while net sales rose 2.91% to Rs 1208.47 crore in Q2 September 2025 over Q2 September 2024.

More News

Capital Market Publishers India Pvt. Ltd

401, Swastik Chambers, Sion Trombay Road, Chembur, Mumbai - 400 071, India.

Formed in 1986, Capital Market Publishers India Pvt Ltd pioneered corporate databases and stock market magazine in India. Today Capitaline corporate database cover more than 35,000 listed and unlisted Indian companies. Latest technologies and standards are constantly being adopted to keep the database user-friendly, comprehensive and up-to-date.

Over the years the scope of the databases has enlarged to cover economy, sectors, mutual funds, commodities and news. Many innovative online and offline applications of these databases have been developed to meet various common as well as customized requirements.

While all the leading institutional investors use Capitaline databases, Capital Market magazine gives access to the databases to individual investors through Corporate Scoreboard. Besides stock market and company-related articles, the magazine’s independent and insightful coverage includes mutual funds, taxation, commodities and personal finance.

Copyright @ Capital Market Publishers India Pvt.Ltd

Designed, Developed and Content powered by CMOTS InfoTech (ISO 9001:2015 & ISO/IEC 27001:2022 Certified)

Site best viewed in Internet Explorer Edge ,   Google Chrome 115.0.5790.111 + ,   Mozilla Firefox 115.0.3 + ,   Opera 30.0+, Safari 16.4.1 +