Nifty Pharma 21868.7 (0.15)
Nifty Midcap 100 54600.55 (0.20)
SENSEX 74616.58 (0.69)
Nifty 50 23123.65 (0.68)
Nifty Smallcap 100 15843.3 (-0.06)
Nifty IT 31403.35 (2.50)
Nifty Bank 52716.25 (0.20)
Nifty Next 50 63151.05 (0.46)
NIKKEI 225 53429.56 (0.03)
HANG SENG 25116.53 (-0.70)
S&P 6586.85 (-0.69)