SENSEX 81985.25 (3.19)
Nifty 50 24800.9 (3.30)
Nifty Bank 55269.4 (3.12)
Nifty IT 37806.7 (5.37)
Nifty Midcap 100 55090.55 (3.51)
Nifty Next 50 64773.15 (3.59)
Nifty Pharma 21078 (0.03)
Nifty Smallcap 100 16710.35 (3.88)
NIKKEI 225 37644.26 (0.38)
HANG SENG 23496.89 (2.75)
S&P 5849.75 (2.81)