SENSEX 76520.78 (-0.45)
Nifty Bank 55298.85 (-0.78)
Nifty Smallcap 100 16239.45 (-1.07)
Nifty 50 23740.9 (-0.53)
Nifty Next 50 66091.3 (-0.61)
Nifty Pharma 23251.8 (-0.41)
Nifty IT 29625.4 (-0.09)
Nifty Midcap 100 56042.45 (-0.74)
NIKKEI 225 54201.78 (-1.50)
HANG SENG 25578.67 (-1.24)
S&P 6733 (-0.86)