Nifty Next 50 61912.75 (2.59)
Nifty Pharma 22011.6 (-0.99)
Nifty Midcap 100 53819.15 (2.22)
Nifty Smallcap 100 15709.8 (3.33)
Nifty 50 22679.4 (1.56)
Nifty IT 29669.05 (2.09)
SENSEX 73134.32 (1.65)
Nifty Bank 51448.65 (2.33)
NIKKEI 225 53011.22 (-1.36)
HANG SENG 25074.69 (-0.87)
S&P 6577.5 (-0.79)