Nifty IT 30441.45 (2.60)
Nifty Next 50 61957.6 (0.07)
Nifty Midcap 100 53677.05 (-0.26)
Nifty Bank 51548.75 (0.19)
Nifty Pharma 21808.4 (-0.92)
Nifty Smallcap 100 15650.5 (-0.38)
SENSEX 73319.55 (0.25)
Nifty 50 22713.1 (0.15)
NIKKEI 225 53084.34 (1.18)
HANG SENG 25116.53 (-0.70)
S&P 6621.75 (-0.19)