Nifty Bank 59891.35 (-0.34)
Nifty Next 50 68693.9 (-0.24)
Nifty Pharma 22136.25 (-0.36)
Nifty Midcap 100 59647.65 (-0.37)
SENSEX 83246.18 (-0.39)
Nifty Smallcap 100 17190.7 (-0.99)
Nifty IT 38902.5 (-0.47)
Nifty 50 25585.5 (-0.42)
NIKKEI 225 53025.76 (-1.04)
HANG SENG 26563.9 (-1.05)
S&P 6961.01 (-0.06)