Nifty 50 25050.25 (-0.72)
Nifty Smallcap 100 16375.9 (-1.95)
Nifty Next 50 66292.5 (-1.22)
Nifty Pharma 21571.6 (-0.66)
Nifty Midcap 100 56955.6 (-1.94)
Nifty Bank 58579.55 (-1.39)
SENSEX 81626.97 (-0.67)
Nifty IT 37640.1 (-1.21)
NIKKEI 225 52692 (-0.56)
HANG SENG 26510.5 (0.09)
S&P 6817.76 (-2.06)