Nifty 50 25694.35 (0.11)
Nifty IT 39086.65 (3.34)
Nifty Smallcap 100 17362.3 (-0.28)
Nifty Next 50 68857.9 (0.10)
SENSEX 83570.35 (0.23)
Nifty Pharma 22217.05 (-1.28)
Nifty Midcap 100 59867.8 (0.16)
Nifty Bank 60095.15 (0.86)
NIKKEI 225 53936.17 (-0.32)
HANG SENG 26844.96 (-0.29)
S&P 6960.46 (-0.07)