Nifty Midcap 100 57145.65 (-1.80)
Nifty Smallcap 100 16352.75 (-1.95)
Nifty IT 38238.5 (-0.17)
Nifty Pharma 21722.25 (-0.94)
Nifty 50 25048.65 (-0.95)
Nifty Next 50 66260.55 (-1.97)
Nifty Bank 58473.1 (-1.23)
SENSEX 81537.7 (-0.94)
NIKKEI 225 52974.74 (0.17)
HANG SENG 27093.42 (1.23)
S&P 6971.15 (0.50)